Construction schedules for industrial, commercial, residential construction utilizing Primavera P3, Suretrak, P3e/c and MSProject. Construction schedules, training, analysis, and consulting for owners, contractors, and subs." />
Construction Scheduling Consultants
866•840•6786  509•427•4474
 Home   Contact Us    Featured Projects    Training   Corporate Overview    

SIS Rates

SIS utilizes electronic communication as much as possible to give the client a cost effective solution to construction scheduling. We have been extremely successful utilizing Web Ex teleconferencing for schedule reviews throughout the United States and the world. We can bring the owner, contractor, subcontractor, engineer, and scheduler together for schedule development and periodic review meetings with each participant in their own office eliminating traditional time and costs.



Project Management Rate
s:

$125-$200/ hr. based on the scope of work.
Call 877-877-2788 or e-mail for an estimate.


Scheduling and Training Rates
:

$100-$200/ hr. includes:

  • Schedule development
  • Analysis, review, updating, and reporting
  • Telephone, Teleconference, Internet Interactive, Web Ex support
  • Training program development
  • Travel time if outside Portland, OR metro area
  • Group / corporate presentations / seminars ($500 min)
  • Enterprise scheduling, company program development and deployment


Records Management and Data Services:

$45 - $125 / hr based upon the scope of work and level of responsibility.

Reimbursed expenses:

  • Cost + 10% for:

    • Airfare
    • Hotel
    • Rental Car
    • Postage and shipping
    • Reproduction
  • Meals and incidentals at IRS standard per diem rates
  • Mileage at standard IRS rate

Extended durations at projects:

  • Per diem of $85 - $275 / day depending on project location and duration
 

 

 

 

 

 


Scheduling and Information Services, Inc. PO Box 174 Stevenson, WA. 98648 509.427.4474 877.877.2788
Copyright © 2014 Scheduling and Information Services, Inc. All Rights Reserved.